Skip to main content

DPR Generator — Setup Guide

The Velora DPR Generator runs entirely on your Windows machine. Your WhatsApp data never leaves your device — all processing happens locally using on-device AI models.

Installation is straightforward — it's a standard Windows installer where you click through a few screens (Install → Next → Finish), just like any other Windows app. This guide is here if you want step-by-step screenshots along the way, but most users get through it without needing to refer back.

Time to set up: 5 to 10 minutes


Step 1 — Download the installer​

Click the button below to download the Velora DPR Generator for Windows.


Step 2 — Run the installer​

Open the downloaded .exe file from your Downloads folder.

If Windows SmartScreen shows a warning dialog, click More info and then Run anyway. This is expected behavior for new software publishers on Windows and does not indicate any problem with the file.


Step 3 — Accept the privacy policy​

Review the privacy policy and click I Agree to continue.

Installer showing the Velora AI privacy policy with an I Agree button

Step 4 — Choose the installation type​

Select whether to install Velora AI for all users on this machine or just for your own account. Either option works — if you're unsure, the default is fine.

Installer screen with options to install for all users or current user only

Step 5 — Choose an install location​

The default install path works for most users. If you need to install to a different drive, change it here. Click Install to proceed.

Installer screen showing the install path with a Browse button and Install to proceed

Step 6 — Wait for installation to complete​

The installer will copy all necessary files. This usually takes under a minute.

Installer progress bar while files are being copied

Step 7 — Finish the installer​

Once the progress bar completes, click Finish. If the Run VeloraDesktopApp checkbox is visible, leave it checked to launch immediately.

Installer completion screen with a Finish button and Run VeloraDesktopApp checkbox

Step 8 — The app downloads the AI models​

On first launch, Velora AI will automatically download the on-device AI models it needs to process your site messages. You will see a download progress screen — keep the app open and let it complete.

Velora AI showing an initial screen as it begins downloading the AI model

Step 9 — Wait for the AI models download to finish​

Download time depends on your internet connection. The models together are around 2.7 GB and only needs to be downloaded once.

AI model download progress bar within the Velora AI app

Step 10 — Accept the Terms of Service​

Once the model download completes, the app will show Velora DPR Generator Terms of Service. Read through and accept to continue.

Velora AI Terms of Service screen with an Accept button

Step 11 — Connect your WhatsApp​

Velora AI connects to your WhatsApp account using WhatsApp Web — the same technology as web.whatsapp.com. When prompted, the app will automatically open a Chrome window with the WhatsApp Web QR code.

WhatsApp Web QR Scan screen on Chrome browser to connect WhatsApp account
info

Your messages are read locally on your device and are never sent to any external server.


Step 12 — Scan the QR code from your phone​

Open WhatsApp on your phone and navigate to Linked Devices:

  • Android: Tap the ⋮ menu → Linked Devices → Link a Device
  • iPhone: Tap Settings → Linked Devices → Link a Device

Point your phone's camera at the QR code shown in the Chrome window. The app will confirm once the connection is successful.

tip

The QR code refreshes every ~20 seconds. If it expires before you scan it, it will automatically refresh — just try again.


Step 13 — Switch to the Groups tab​

Once WhatsApp is connected, return to the Velora DPR Generator window and click the Groups tab. This is where you'll find and select your site groups.

Velora DPR Generator with the Groups tab highlighted in the navigation

Step 14 — Select your site groups​

Velora AI will list all your WhatsApp groups. Select the groups you use for site coordination — you can select multiple groups — and click Save Selection.

Group selection screen listing WhatsApp groups with checkboxes and a Save Selection button

ONLY the site groups that you explicitly select are monitored by the DPR Generator. Plus, no messages ever leaves your device - so your private chats are completely safe.

tip

If a site has multiple coordination groups (e.g. one for labor, one for supervisors), you can add all of them.

tip

Choose active groups. Velora builds your log from messages coming in — so pick groups where your team is actively sending updates throughout the day. If you add a group that's been quiet for a while, it may take time before messages appear. The more active the groups you select, the faster you'll see your first log take shape.


Step 15 — Review and confirm categorization​

Velora AI will begin processing recent messages from your selected groups and categorizing them by type: progress updates, issues, labor attendance, target commitments and more. Review the categorization before generating your first report.

You may manually reclassify messages, that you believe should be differently placed in your site reports.

Velora AI showing categorized site messages grouped by progress, issues, attendance, and commitments

Step 16 — Your first DPR is ready​

Your Daily Progress Report (DPR) is now generated and structured. You can finalize and share it with your client, PMC or head office, saving you at least 1 to 2 hours daily.

Velora DPR Generator showing a formatted Daily Progress Report generated from WhatsApp messages

The app will continue monitoring your groups, building your log as new messages come in throughout the day.

tip

The DPR Generator relies on an active WhatsApp Web session in Chrome. Keep that tab open and revisit the app during the day — your DPR updates as new messages come in.


Troubleshooting​

QR code expired before I could scan it
The QR code refreshes automatically every ~20 seconds. Wait for a fresh code and try again, or restart the connection flow from within the app.

WhatsApp says "Too many linked devices"
WhatsApp allows up to 4 linked devices per account. Go to Linked Devices on your phone, remove a device you no longer use, and then try linking again.

The app isn't picking up older messages
The DPR Generator begins reading from the point of connection onward. Backfilling historical messages is not supported in the free DPR Generator.

Windows Defender or antivirus is flagging the installer
This can happen with newly released executables. If you'd like to verify the file, reach out at support@velora.ai and we'll share the checksum.


What's next?​

Site Pro gives you always-on site monitoring without keeping your desktop running — plus multi-site management, progress tracking, AI-drafted DPRs, and automated follow-ups. Book a demo →